[1]
Kumar, R., HAQ, A.U., Bhat, G.M., Singh, Y. and Dar, J.A. 2021. Sediment Budget and Sediment Trap efficiency of Baglihar Hydroelectric project Reservoir – a calibrated model for prediction of longevity of the Dam. Journal of The Indian Association of Sedimentologists (peer reviewed). 38, 1 (Jun. 2021), 65–74. DOI:https://doi.org/10.51710/jias.v38i1.173.